Cold feed

Author:管理员 Time:2017/11/17
     The traditional hot patching construction in low temperature and rain due to climate, unable to meet the high grade highway rapid repair requirements. Therefore, the pit repair technology needs to meet the requirements of fast, timely and all-weather. The cold filling material has the advantages of fast construction speed and simple operation, which can meet the requirements of pit and groove repair in winter and rain and snow weather.
010-67893003
请您留言

感谢您的关注,当前客服人员不在线,请填写一下您的信息,我们会尽快和您联系。

提交